I finally got some motivation today to work in the ensuite! I sanded down the walls, dapped everything that needed dapping (that was a lot because of the back splash being glued to the walls), I sanded the floor and then wiped down the walls.
Why stop there right? I installed the new flooring too! I think that part took about 3 hours but it sure looks great. Its the Allure flooring from Home Depot (a vinyl laminate interlocking floating floor).
Ok... I am off to do a bit more dapping so I can be ready for round 2 of sanding tomorrow so I can start the painting. After that, the toilet, sink and cabinet is all up to Brian!


No comments:
Post a Comment